Projects

Lowe’s Distribution Center

Mt. Vernon, Texas

Rollcon completed 468,825 SF of 8” RCC paving for a Lowes Distribution Center in just 3 weeks. Through precise planning and advanced placement methods, the team delivered a durable, high-strength surface built to handle heavy traffic while minimizing maintenance and maximizing long-term performance.

  • General Contractor

    Brad Drake Construction

  • Project Size (SF)

    468,825 SF

  • Construction Duration

    3 weeks

  • Market