Phillips 66

Rollcon delivered a turnkey pavement solution for Phillips 66. Rollcon excavated the subgrade, installed the roller compacted concrete (RCC), and then installed limestone shoulders. Rollcon designed, mixed, and installed 400,000 square feet of RCC, which included 200,000 square feet of subgrade preparation work along with 25,000 linear feet of limestone-base shoulder work. During this process, Rollcon did not interrupt any of the facility’s operations, while providing cost savings in comparison to asphalt and concrete.