Port of Beaumont | CY Lot 5 & 13
Beaumont, Texas
The Port of Beaumont elected to utilize Roller Compacted Concrete for their Lot’s 5 & 13 due to construction schedule and over cost. The 350,000-sf project was designed at 18” thick by Lanier and Associates, who contracted with Niguel Nixon Partners to help with the design of the RCC. Rollcon was selected with Gulf Coast to provide quality RCC installation.
