Manufacturing & Distribution Center | Rollcon https://rollconllc.com Fast. Economical. Durable. Tue, 17 Nov 2020 00:13:13 +0000 en-US hourly 1 https://wordpress.org/?v=6.4.4 https://3nzf1b.a2cdn1.secureserver.net/wp-content/uploads/2020/10/cropped-Rollcon-Favicon-32x32.png Manufacturing & Distribution Center | Rollcon https://rollconllc.com 32 32 SEC Industrial Park https://rollconllc.com/project/sec-industrial-park/ https://rollconllc.com/project/sec-industrial-park/#respond Mon, 02 Nov 2020 17:04:19 +0000 http://rollcon.studiobranddev.com/?post_type=project&p=719 Rollcon installed 21,000 CY of 15-inch roller compacted concrete (RCC) in place of the client’s existing aggregate-base yard. The main challenge was working around the continuous operation of the facility. The second largest challenge was the requirement to design final paving elevations of the RCC that were the same as the final elevations of the existing aggregate base. The scope of the project included milling 15 inches of the existing aggregate base, cement stabilization of the existing subgrade, and placement of 15-inch RCC. Rollcon successfully completed all four phases of the project.

]]>
https://rollconllc.com/project/sec-industrial-park/feed/ 0
Tenaris https://rollconllc.com/project/tenaris/ https://rollconllc.com/project/tenaris/#respond Mon, 02 Nov 2020 17:00:49 +0000 http://rollcon.studiobranddev.com/?post_type=project&p=713 Rollcon’s paving solution for Tenaris—Bay City was to provide over 120,000 tons of RCC pavement for a project’s average 28-day breaks at 5,500+ PSI. Rollcon provided paving for more than 2.2 million square feet of industrial roads. The durability of RCC mean Tenaris’s six-inch, eight-inch, and 14-inch RCC pavement streets can last up to 20 years without failures—more than twice as long as asphalt. RCC provides many other benefits, including minimal labor costs, high strength, low maintenance costs, and next-day traffic.

]]>
https://rollconllc.com/project/tenaris/feed/ 0
Port 10 Logistics Center https://rollconllc.com/project/port-10-logistics-center/ https://rollconllc.com/project/port-10-logistics-center/#respond Mon, 02 Nov 2020 16:27:00 +0000 http://rollcon.studiobranddev.com/?post_type=project&p=694 Port 10 Logistics Center is a state-of-the art logistics center featuring multi-modal capabilities for truck, rail, ship, and barge-served transport needs. The first phase consists of four buildings on a 100-acre site totaling 992,669 square feet. When complete, the project consists of eight buildings totaling more than three million square feet on 256 acres and includes more than two million square feet of seven-inch and nine-inch RCC pavement.

]]>
https://rollconllc.com/project/port-10-logistics-center/feed/ 0