HOYER | Facility Rehabilitation

HOYER | Facility Rehabilitation

Pasadena, Texas Rollcon provided a Design-Build solution for Hoyer by delivering a turnkey demo and replace of the active facility. This project was broken into 3 phases and completed in approximately 2 calendar months consisting of 10”, 12”, & 16”...
Port of Victoria | Dock and Infrastructure Improvement

Port of Victoria | Dock and Infrastructure Improvement

Victoria, Texas Rollcon completed 2.5 miles of 40-foot-wide 14” dual-lift RCC pavement roads for infrastructure improvement. The project also included a seven acre 14” dual-lift cargo unloading dock. Roller compacted concrete was selected for the job due to the higher...
Port of Beaumont | CY Lot 5 & 13

Port of Beaumont | CY Lot 5 & 13

Beaumont, Texas The Port of Beaumont elected to utilize Roller Compacted Concrete for their Lot’s 5 & 13 due to construction schedule and over cost. The 350,000-sf project was designed at 18” thick by Lanier and Associates, who contracted with Niguel Nixon...
Port Houston | Bayport CY 2 South

Port Houston | Bayport CY 2 South

Bayport, Texas Container yard 2 south project consisted of the design and construction of approximately 17.5 acres of concrete pavement (18” roller compacted concrete) for storage of containers as well as traffic lanes to maintain circulation into and around storage...